Partnering with engineering firm Laporte, we completed the extension of an existing cleanroom and connected the new cleanroom with the existing one.
- Windows are fully flush mounted for a flat finish against the wall.
- The high ceiling is 10 feet tall with HEPA filters.
- There are multiple pre-cut custom openings in the walls for the installation of water pipes and other utilities.
- We also engineered a removable wall panel to allow a large filling machine to be brought into the cleanroom at a later date (after cleanroom installation is complete).